success-story-structural-steel-engineering-construction-electrical-installation.jpg
Electrified

Electrical installation of a shelving system

Ad-hoc assignment at the construction site

Hector Egger Holzbau AG in Langenthal offers innovative and sustainable timber construction in residential, office and industrial buildings as well as in general contractor projects.

In this project, we were able to support our customer at short notice with the electrical installation of a shelving system where there was no electrician on site. Our electrician, with experience in plant construction, was on site the very next day.

Successful project execution thanks to presence and cooperation

From the start of assembly, we were able to point out problems and solve them successfully. Through our intervention on site, and the intensive cooperation with the project management and the technicians of our client, we found sustainable solutions, especially for dust protection and the quick correction of a planning error for electrical lines on site. We were able to coordinate and schedule important work, such as fence installation, core drilling and the positioning of the contour control cable routing, in each case directly on site with the client.

Thanks to our ad-hoc deployment to the construction site and proactive intervention on site, the schedules for the electrical installations were adhered to and the work was carried out in the desired quality while keeping costs under control.

On to the next success story

Cost-reduced

Building-supporting high-bay warehouse with façade cladding

© Copyright 2024 Fassmann + Partner AG. All rights reserved.